← Cost videos

VECTORIA COST · DEMONSTRATION

Find items in a BC3 cost database and update an estimate with Vectoria Cost

Vector consults a cost database and an estimate to add covers for six inspection chambers. The process shows how it resolves an unsuitable match, narrows down the references and prepares changes for the user to review before applying them.

Visual demonstration without narration. The text on this page explains the process and the results shown.

0:49

WHAT THE VIDEO SHOWS

The task in this example

Find suitable items in a cost database and add them to the estimate with the required dimensions, class and quantities.

The process, step by step

  1. Open the CIEC cost database and the estimate’s BC3 file, then ask the agent to find an inspection chamber cover item.
  2. Review the matching items in detail and refine the proposal: two square covers and four rectangular covers, class B-125 in this example.
  3. Check the two supply items, their quantities and amounts, then accept the changes to add them to the estimate.

Explore Cost

Explore the product’s tools and access options.

Discover Vectoria Cost